© 2004-2026 | Advance Mobile Software Solutions, Inc. ® | All Rights Reserved
SOFTWARE NEWS
The Name of DCIM Solution suite changes from CableSolve To CS
Advance Mobile Software Solutions announces today, October 27, 2014, that Samsung Inc. is a new client in the Radio Frequency Identification. Samsung is using the technology to become more efficient and increase awareness
451 Research Reports CS DCIM Solution Leads With Mobility, Configurablity and Value!
John Stanley, Senior Analyst – Data Center Technologies and Eco-Efficient IT at 451 Research, recently reviewed Cormant’s DCIM solution, taking notice of industry leading mobility, configurable and value.
CableSolve Selected as NetworkWorld’s Product of the Week 26 March 2012
Advance Mobile Software Solutions announces that it's partner Cormant Inc., a software development company specializing in IT infrastructure management solutions for the data center (DCIM) and beyond, today announced that CableSolve was selected as one of Network World’s products of the week for March 26, 2012.
A Manifesto for Efficient
IT Infrastructure Management.
Data center infrastructure management (DCIM) is about more than just managing environmental data of the assets inside the live data center space. DCIM needs to include all aspects of the equipment in the data center, extending to the entire life cycle of the asset, from purchase to end of life.
Oil and Natural Gas Corporation Chooses CS for Data Center Infrastructure Management Needs.
Cormant Inc., a software development company specializing in mobile IT infrastructure management solutions for the data center (DCIM) and beyond, today announced its CableSolve solution has been selected by India-based by Oil and Natural Gas Corporation (ONGC) to document, manage and monitor the physical connectivity infrastructure IT Layer.
It’s no secret that data centers consume a lot of power, with estimates putting it at about two percent of the global energy consumption.2 There are several things that IT managers can do to improve energy efficiency, starting with an assessment of the current data center conditions. Are there unused servers that could and should be shut down? What are the best candidates for virtualization? What factually are the least efficient pieces of equipment in the data center? Without truly managing the infrastructure, determining problem areas can be next to impossible
The Manifesto
Steps need to be taken to manage the IT infrastructure (whether you call that DCIM, ITIM, or something else) more efficiently. Start by deciding what data is important to be able to manage the data center efficiently. There is no single list and no one-size fits all answer. It all depends on the age, size, scale and equipment in each unique environment. Then, pick a management system that will truly consolidate all the data currently managed in spreadsheets, and the data that should be managed, but isn’t because it’s too hard. Strongly consider whether or not the solution requires hardware to be purchased and whether this will add to your problems or lock you into one system? Next, ensure there are real, positive processes in place to keep the data up-to-date; no tool is of any use if it’s too much trouble to keep it accurate. Some systems make this easier than others. This is critical, as no tool by itself, no matter how fancy, or whatever the vendor says – is going to solve problems by itself. The next step, using the data for planning and further change, requires trust in the data. Do not fall into the trap of using the tool and still doing a physical audit each time change is required. All of this can be achieved, but it’s not easy and there are no magic bullets. Do not believe a vendor that says their system will solve all your problems without process changes; it won’t!
Properly managing your infrastructure is critical to being able to avoid downtime as well as meet operational efficiency demands. If you are cutting your data center short on proper management to conserve money today, it is almost certainly costing you more in the long run, both in resources and downtime. Whatever the future plans for your data center include, whether it is a move to virtualization, trying to become more green or moving to a cloud model , having up-to-date, centralized records of all aspects of your assets, the facility, the connectivity and historical data (not in spreadsheets!) will help to make those transitions run more smoothly. While no two enterprises are ever the same in what they want to manage, the principle that change cannot be managed effectively without accurate consolidated data and a truly effective infrastructure management system applies to everyone.
References: Ponemon Institute. Calculating the Cost of Data Center Outages. 2011, Cormant, Inc. Published Links: ReadWriteWeb, Data Center Journal, InfoTech Spotlight
A Manifesto for Efficient IT Infrastructure Management.
Powered by QnE, Inc.™ | Office: 408.938.5715 | Fax: 408.938.5714 | Policy | Location